Ready For Inspection functional Joinery
Description
Inner catch handle on the master bedroom window has not been installed. Hardware kit needed.
Photos
No photos yet.
Comments
No comments yet.
015
Drawing
Level 6 • Tower A — Level 6
Trade
Joinery
Assignee
Suresh Kumar
Due date
18 May 2026
Severity
functional
Raised by Arjun Sharma • 14 min ago
Update status
History
- Open → Ready For InspectionSuresh Kumar • 1 day ago
- OpenArjun Sharma • 3 days ago
Snag raised